Maintenance scheduling

Derived from the Timefold Quickstarts maintenance-scheduling example (Apache-2.0; see the repository NOTICE), with modifications: assigns a crew (Crew) and a start date to maintenance jobs (Job) to minimize early/late maintenance. A C++ domain on top of the generic engine in core/optimaru/ (late acceptance + ALNS), with a Python package (maintenance_scheduling) via pybind11.

Usage

OPTIMARU_USE_CASES=maintenance_scheduling uv sync      # builds only this use case's C++ extension
uv run pytest -q tests/maintenance_scheduling
from optimaru import maintenance_scheduling as mnt

schedule = mnt.generate_demo_data()
result = mnt.solve(schedule, time_limit_seconds=5.0, random_seed=42)
print(result.score)

solve takes time_limit_seconds, random_seed, parallel_solver_count, stop_at_first_feasible, full_assert, on_new_best, a full config (maintenance_scheduling.SolverConfig) and constraints (see below).

SolverConfig holds the search knobs; optimaru/maintenance_scheduling/_core.pyi lists them. Two of them run destroy-and-repair as an ordinary move judged by the acceptor, besides the kicks on stagnation: ruin_recreate_as_move_weight is the probability that a step draws one (0, the default, turns it off) and ruin_recreate_as_move_max_ruin is its ruin size (12 by default).

The C++ side builds and tests with:

cmake -B build -DOPTIMARU_USE_CASES=maintenance_scheduling && cmake --build build -j
ctest --test-dir build

Domain encoding

A Job has two decisions — its crew and its start date (weekdays only) — and its end date is derived from them. The engine supports one assignment-shape int value per entity, so both are packed into one value, the composite encoding pattern of school-timetabling:

crewDate = startDateIndex * crewCount + crewIndex     # -1 == unassigned
  • startDateIndex indexes the list of weekdays (Mon-Fri) of the calendar [fromDate, toDate) (MaintenanceSchedule::startDates; start_dates() in Python).
  • The end date is a pure function of (duration, startDateIndex), so it is precomputed into a table (endDateByDur) in the prepare step. It is the exclusive end date skipping weekends (plus_business_days in Python).
  • All dates are epoch days (days since 1970-01-01).

C++

  • optimaru/maintenance_scheduling/cpp/mnt/model/domain.hpp — domain + optimaru::SolutionTraits specialization
  • optimaru/maintenance_scheduling/cpp/mnt/constraints/ — one component per constraint: min_start_date_cost.hpp, max_end_date_cost.hpp, before_ideal_end_date_cost.hpp, after_ideal_end_date_cost.hpp, crew_conflict_cost.hpp, tag_conflict_cost.hpp (+ common.hpp: the per-job and day-overlap bases); optimaru/maintenance_scheduling/cpp/mnt/constraints.hpp assembles the default set (defaultConstraints())
  • score_calculator — full recompute (the reference)
  • incremental_calculator — before/after hooks, O(job calendar length) per move
  • solver — engine wrapper (CH + Late Acceptance + ALNS, guided selection)

Constraints

Constraint (Python name) C++ component Default level Default weight Raw cost (0 = no violation)
min_start_date_cost MinStartDateCost hard 1 per (start date, crew) cell: days its jobs start before their min_start_date
max_end_date_cost MaxEndDateCost hard 1 per cell: days its jobs' (exclusive) end date passes their max_end_date
before_ideal_end_date_cost BeforeIdealEndDateCost soft 1 per cell: days its jobs end before their ideal_end_date
after_ideal_end_date_cost AfterIdealEndDateCost soft 1,000,000 per cell: days its jobs end after their ideal_end_date
crew_conflict_cost CrewConflictCost hard 1 global total: overlapping calendar days summed over same-crew job pairs
tag_conflict_cost TagConflictCost soft 1,000 global total: shared tags x overlapping days summed over job pairs

The rows are in list_constraints() order (the four per-job unit constraints first, the two global ones after them). Every constraint is flippable (level="hard" / level="soft", or Level.HARD / Level.SOFT; level="medium" raises ValueError, the domain has no medium level), none is a reward and all six are scored by default (default_enabled); maintenance_scheduling.constraint_info() reports exactly this table from the C++ components (kDefaultLevel / kDefaultWeight), and the CP-SAT benchmark reads the same rows. exponent shapes the date constraints per cell and the two global conflict constraints on their single total. Unassigned jobs contribute nothing.

The _cost suffix separates the constraint names from the job fields min_start_date / max_end_date. The defaults are declared once, in the C++ components.

Besides weight, level and exponent, every constraint takes offset and clip (keyword-only), and may be picked several times. A raw cost x (per cell for the four date constraints, the single total for the two conflict constraints — the granularity of exponent) is shaped as sign(x) * max(0, |x| - offset) ** exponent (clip=True, the default) or (x - offset) ** exponent, sign-preserving (clip=False, which lowers the penalty of every cell below the offset, an empty one included: every crew on every start date); offset=0 is the plain shaping. Both apply per cell (or to a conflict constraint's one total), not to the sum over the cells. clip=False with an offset is refused on hard (the two start/end date constraints and crew_conflict_cost by default), because hard 0 must mean no violation. Each pick is its own instance with its own knobs, its level included, and the instances add up:

from optimaru.maintenance_scheduling.constraints import TagConflictCost, get_constraints

mnt.solve(schedule, constraints=[
    *get_constraints(),                                  # the defaults
    TagConflictCost(weight=100, exponent=2, offset=10),  # + 100 x (tag-conflict days beyond 10)^2
])

mnt.constraint_costs(schedule, picks) keys the second pick tag_conflict_cost#2. The CP-SAT reference takes integral offsets.

Score mapping: this use case scores hard and soft only, so it maps 1:1 onto the engine's Score(int64 hard, double soft), with the soft weights 1 / 1,000 / 1,000,000. The two pairwise constraints reduce to sums of C(n,2) over per-day occupancy counts (equivalent to summing pairwise overlapping days, since the intervals are contiguous) and are scored incrementally in O(job calendar length) per move.

Job::pinned (the engine's pinning hook) — counts in the score, but the solver never moves it.

Build / run

cmake -B build -DCMAKE_BUILD_TYPE=Release -DOPTIMARU_USE_CASES=maintenance_scheduling && cmake --build build -j4
./build/maintenance_scheduling/mnt_test          # constraint hand checks + incremental==full + ScoreChecks::Full
./build/maintenance_scheduling/mnt_plugin_test   # plugin assembly == monolith, raw costs by hand, catalog, overrides
./build/maintenance_scheduling/mnt_demo          # the SMALL demo instance, 10 s, checks hard 0
./build/maintenance_scheduling/mnt_demo 15 --large

OPTIMARU_USE_CASES=maintenance_scheduling uv sync      # builds only this use case's C++ extension
uv run pytest -q tests/maintenance_scheduling

The demo data is drawn from a seeded std::mt19937_64 (seed 17), so it is the same on every platform (SMALL: 3 crews/8 weeks/14 jobs, LARGE: 5 crews/16 weeks/ 48 jobs; starting next Monday). Both SMALL and LARGE reach hard 0 within seconds.

Starting from an existing solution

with_initial_solution(problem, solution) returns a copy of problem whose search starts from solution, which is MaintenanceScheduleModel.from_core(schedule) or that model as a JSON dict. solve takes the engine object, so convert the result with to_core():

from optimaru.maintenance_scheduling.models import MaintenanceScheduleModel

problem = MaintenanceScheduleModel.from_core(mnt.generate_demo_data())
solved = MaintenanceScheduleModel.from_core(schedule)           # `schedule` solved above
restart = mnt.with_initial_solution(problem, solved).to_core()
mnt.solve(restart, time_limit_seconds=5.0, random_seed=43)
print(restart.score)

Jobs are matched by id. A job the solution leaves out is placed by the construction heuristic, and a complete solution is exactly where the search starts. Pinned jobs keep their crew and start date on problem, whatever the solution says. ValueError is raised for an unknown id, for a job with only one of crew_id and start_date, and for a start date that is not a weekday inside the work calendar.

Extending

Engine contracts and code skeletons: docs/extending.md. The solution has the assignment shape; the domain solver that configures the engine is optimaru/maintenance_scheduling/cpp/mnt/solver.hpp + optimaru/maintenance_scheduling/cpp/mnt/solver.cpp.

Adding a move. The engine already mixes change / swap moves (weights in Solver::Config). This use case relies on the engine's generic moves only; it has no domain move yet. A new move is a optimaru::MoveOperator<…> registered with engine.add_move_operator(...) next to the engine construction in optimaru/maintenance_scheduling/cpp/mnt/solver.cpp; a ruin for LNS is a RuinOperator registered with engine.add_ruin_operator(...).

Changing the construction heuristic. Entities are placed in index order (First Fit). Set engineConfig.construction.difficulty for First Fit Decreasing ordering, or pre-assign part of the solution in the domain solver's solve before the engine runs — the engine only fills what is still unassigned.

Adding a hard or soft cost. Adding a constraint, step by step takes one new constraint through this use case's files in six steps: changed from Python, written as a component, tested, made cheaper per move, moved to the default fast path and measured.

Benchmark

benchmarks/maintenance-scheduling compares this use case with OR-Tools CP-SAT on the same instances.